Customization: | Available |
---|---|
After-sales Service: | 12 |
Warranty: | 12 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Road Construction Equipments include loaders, bulldozers, road rollers, graders, structural parts, work tools and other components. Construction Machinery has a variety of wheel loaders, road rollers, graders and track-type tractors. All products meet or exceed the quality and reliability requirements of the local industry to meet the needs of customers in China and the global construction machinery industry.
1.The supercharged engine 75kw, high reliability of the hydraulic torque converter and transmission to provide super power, increase engineering special bridge walk smoothly and high reliability.
2.Mining, loading all the pilot control function, lightweight flexible, high work efficiency.
3.Humanized design rotating vibration damping seat full toughened glass molding cab, grander vision, driving more comfortable.
4.Lateral sliding mechanism of the available device, make the digging work scope is larger and more efficient.
5.With differential, wet brake drive axle has greatly increased the traction performance and vehicle safety performance of the machine.
Overall Operating Weight
|
8200kg
|
Loader Bucket Capacity
|
1.0m3
|
Rated Load Weight
|
2500KG
|
Backhoe Capacity
|
0.3 m3
|
L*W*H(mm)
|
6230×2365×3752
|
Wheel base
|
2200mm
|
Min. Ground Clearance
|
300mm
|
Breakout Force
|
38KN
|
Bucket Dumping Height
|
2650mm
|
Bucket Dumping Distance
|
1025mm
|
Digging Depth
|
52mm
|
Max. Digging Depth
|
4085mm
|
Swing Angle of Excavator Grab
|
190o
|
Max. Pulling Force
|
39KN
|
Engine
|
|
Model
|
YC4A105Z-T20
|
Type
|
turbocharging four-stroke
|
Cylinder-Inside Diameter*Stroke
|
4-105
|
Rated Power
|
75KW/100HP
|
Rated Speed
|
2400r/min
|
Min. Fuel Consumption
|
235g/kw.h
|
Max.Torque
|
310NM
|
Displacement
|
4.3L
|
Transmission Gearbox
|
|
Type
|
Fixed Shaft Power Transmission
|
Oil Pressure of Clutch
|
1373Kpa-1569 Kpa
|
Gears
|
Two Gears Ahead, Two Gears Astern
|
Max.Speed
|
22Km/h
|
Steering System
|
|
Model of Steering Device
|
BZZ5-250
|
Steering Angle
|
±36 o
|
Min. turning radius
|
6581mm
|
Pressure of the system
|
12Mpa
|
Hydraulic System
|
|
Digging Power of Excavator Grab
|
46.5KN
|
Digging Power of Dipper
|
31KN
|
Bucket Lifting Time
|
5.4S
|
Bucket Lowering Time
|
3.1S
|
Bucket Discharge Time
|
2.0S
|
Brake System
|
|
Service Brake
|
Air Over Oil Caliper Brake
|
External Type
|
|
Self-regulation
|
|
Self-balance
|
|
Emergency Brake
|
Operation Power Implementing brake
|
Manual Operation Power Terminating Brake
|
|
Axle
|
|
Manufacturer
|
Feicheng Axle Factory
|
Main Transmission Type
|
Double Reduction
|
Final Reducer
|
Single Stage Final Reducer
|
Tyre
|
|
Model
|
14-17.5/19.5L-24
|
Pressure of Front wheel
|
0.22 Mpa
|
Pressure of Back Wheel
|
0.22 Mpa
|
SINOCTM is located in Jinan city, Shandong province, SINOCTM aims to provide the project solutions with best cost performance to customers from China and abroad. Our main business are construction solutions consultancy, equipments supply, technical instruction, parts supply, service & training, logistic support and etc, providing the steward type service.
We cooperate with china premium brands to provide tailored project solutions to your specific needs. We can help you to avoid long-time communication with different suppliers, which will save you time and cost. As to after market, with many years′ experience in the industry and long-term partnership with the suppliers, we do provide timely after market with lower cost and higher availability.
Six Free Services
Free technical enquiries with our experts.
Free repair service during warranty period.
Free special services for all key construction projects.
Free 0 hour service upon deliver of machine.
Free training of operators and repairs staff.
Free maintenance service tracking (customer to provide resources)
If Shantui machinery is in operation in key projects on a provincial level or higher, the customer will receive special services from Shantui (free special coating service, on-site service, extended on-site service). These special services will allow customers to work more freely without any worries.
Hot Sale Products
Q1. What's your MOQ?
A1. One unit trailer or truck.
Q2. What is your terms of payment?
A2. T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of shipment?
A3. Generally, we ship our truck by ro-ro ship , bulk cargo vessel, container etc. spare parts are packed in wooden cases, shipped by containers
Q4. What is your terms of delivery?
A4. EXW, FOB, CFR, CIF
Q5. How about your delivery time?
A5. It will take 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Do you test all your goods before delivery?
A6. Yes, we have 100% test before delivery